Stockholm Exergi BECCS is an innovative project for the capture and permanent storage of 800,000 tonnes of biogenic CO₂ per year, obtained from the treatment of flue gases from Stockholm’s biomass-fueled power plant.
The Profertil project in Bahìa Blanca was at the time of its construction the largest single train plant in the world with the capacity of 3,250 tons/day of urea.
Located 260 km offshore Luanda (Angola) the development of Kaombo Field began in 2014 with the EPCI contract award from Total Angola for the engineering, procurement, construction, installation, commissioning, and operation and maintenance of two turret- moored FPSO units.
The project has been recognised as the “1st conversion in the world of a traditional refinery into a biorefinery”. It laid the foundation for a strategic collaboration established in 2023 between ENI and Saipem, aimed at converting existing facilities into biorefineries and developing new ones.
In September 2022, two contracts were assigned by Eni Côte d'Ivoire for the Baleine Phase 1 Project, in order to develop the sizeable Oil and Gas field just offshore the Côte d'Ivoire, at a depth of 1,200 m.
The Trans Adriatic Pipeline operates 878 km of pipeline, in-line with world- class performance standards of preparedness and accountability.
Woodside Energy, an Australian energy company, is developing the Scarborough natural gas field in the Carnarvon Basin, about 375 km off Western Australia. For the project, Saipem installed a trunkline linking a semi-submersible floating production unit at 950 meters depth to Pluto Train 2 at the onshore Pluto LNG plant.
The Barzan Pipeline Project included the decommissioning and installation of new pipelines to deliver sour gas from three well sites with unmanned wellhead platforms, all located in the North Field Offshore of the State of Qatar, to an existing onshore Gas Plant located at Ras Laffan Industrial City, Qatar.
The Ichthys Project produces 8.4 million t of LNG and 1.6 million t of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.
Blue Stream was a testing ground for both Saipem and the industry. At the time, working at a depth of nearly 2,200 meters had never been done before.
The 516 km long Greenstream gas pipeline (Libyan Gas Transmission System - LGTS), running from Mellitah, Libya to Gela in Sicily, is still the longest sealine laid in the Mediterranean Sea and one of the biggest challenges ever faced in terms of design and complexity.
The NLNG Complex, operated by Nigeria LNG Limited, is located at Finima on Bonny Island, approximately 40 km south of Port Harcourt in Rivers State, Nigeria.