PERRO NEGRO 7 Efficiency: Cantilever retrofitted to accomodate diverter system and two bop stacks Performance: Drill floor tubular handling system arrangement to allow off-line stand building Well testing and completion: Equipped with complete flare boom and burner head systems Perro Negro 7 pdf - 11-2023 Download