Saipem, in tandem with Saudi Aramco, achieved a new pipeline shore pull record with the Berri Downstream Pipeline. Shore pull operations were conducted by utilizing the biggest and most powerful linear pulling winch ever used in the Kingdom of Saudi Arabia, which has an 800-ton pulling capacity.
The project involved two EPC (Engineering, Procurement and Construction) contracts for the Jazan Integrated Gasification Combined Cycle project, located near the city of Jazan, in southwestern Saudi Arabia.