Sapinhoá Norte and Cernambi Sul

  • ClientPetrobras
  • Project time2012-2015
  • LocationBrazil
  • Field of activityOffshore

Development of the Pre-Salt Risers in the Santos Basin

  • Type of contract: engineering, procurement, fabrication, installation and pre-commissioning
  • Vessel employed: FDS 2
  • Field location: 300 kilometres off the coasts of the Rio de Janeiro and São Paulo states
  • 2200meterswater depths
  • 14km18" gasline
  • 5,5km20" gasline
  • 4PLETS (Pipeline End Terminations)

The scope of work

The scope of work encompasses the engineering, procurement, fabrication, installation and pre-commissioning of the SLWR (Steel Lazy Wave Riser) for the collection system at the Sapinhoá Norte field, and of the FSHR (Free Standing Hybrid Risers) for the gas export systems at the Sapinhoá Norte and Cernambi Sul fields.

 

The offshore activities are performed by the highly-specialized Saipem FDS 2 vessel and have started in the third quarter of 2014. Saipem is using its yard in Guarujá for the fabrication of part of the Risers system equipment.