Second quarter 2013 results and interim financial report at June 30, 2012
|
|
||||||
|---|---|---|---|---|---|---|
| Mo | Tu | We | Th | Fr | Sa | Su |
| 29 | 30 | 01 | 02 | 03 | 04 | 05 |
| 06 | 07 | 08 | 09 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 |
23
May 23, 2013x |
24 | 25 | 26 |
| 27 | 28 | 29 |
30
May 30, 2013x |
31 | 01 | 02 |
Year 2003-2008
Client:
Agip Energy & Natural Resources (Nigeria) Ltd.
Location:
NIGERIA
Description:
FPSO unit
Tonnage 138,939 dwt
Length 271 m
Width 55.4 m
Storage capacity 1,035,000 bbls
Oil capacity 80,000 bopd
Water capacity 32 - 50,000 bwpd
Gas capacity 100 mmscfd
Water depth 70 m
Scope of Work:
Provision of FPSO, operations and maintenance services
Year 2003-2006
Client:
Total E&P Angola
Location:
ANGOLA, Block 17
Description:
FPSO unit
Length 300 m
Width 63 m
Storage capacity 2,000,000 bbls
Oil prod. capacity 240,000 bopd
Produced gas 280 mmscfd
Water injection 405,000 bwpd
Gas injection 167 mmscfd
Topside 12 modules,
weight 28,000 t
Water depth 1,200 m
Scope of Work:
Engineering, Procurement, Construction (EPC) of the complete FPSO
Year 2008-2017
Client:
Sonangol P&P
Location:
ANGOLA, Gimboa field Block 4/05
Description:
FPSO unit
Tonnage 273,777 dwt
Length 337 m
Width 54.5 m
Storage capacity 1,800,000 bbls
Oil capacity 60,000 bopd
Gas capacity 37 mmscfd
Water capacity 60,000 bowd
Desulphated water injection 60,000 bowd
Topsides and riser balcony modules
Water depth 650 m
Scope of Work:
Provision, operations and maintenance services of FPSO unit
Year 1998-2006
Client:
Agip
Location:
ITALY
Description:
FPSO unit
Tonnage 139,000 dwt
Length 309.4 m
Width 40.8 m
Storage capacity 550,000 bbls
Oil capacity 18,900 bopd
Water capacity 5,000 bwpd
Scope of Work:
FPSO supply and operations (50% Joint Venture)
Year 2002-2006
Client:
Exxon Exploration & Production Nigeria Ltd.
Location:
NIGERIA
Description:
FPSO unit
Length 285 m
Width 63 m
Storage capacity 2,200,000 bbls
Oil rate production 210,000 bopd
Water injection 150,000 bwpd
Produced gas 540,000 mmscfd
Gas injection 510,000 mmscfd
Topside 18 modules,
weight 400 t to 2,800 t,
total 31,000 t
Water depth 1,200 m
Scope of Work:
Detailed design, procurement, precomm., hook-up & commissioning, start-up assistance
Year 2005-2017
Client:
Petrobras
Location:
BRAZIL, Golfinho field
Description:
FPSO unit
Tonnage 273,775 dwt
Length 337 m
Width 54.5 m
Storage capacity 2,215,000 bbls
Oil capacity 100,000 bopd
Gas capacity 123 mmscfd
Water capacity 50,000 bwpd
Water injection 140,000 bwpd
Number of modules 16
Topsides weight 12,000 t
Water depth 1,400 m
Scope of Work:
EPCI works, operations and maintenance
Year 2002-2004
Client:
Greenstream B.V.
Location:
LIBYA
Description:
Installation of submarine pipeline from the Libyan shore to the Sicilian shore through the Mediterranean Sea. Max. w.d. 1,115 m 1 submarine pipeline, 32”, km 516
Scope of Work:
Installation engineering, project management, shore approaches, pipelaying, post-trenching, hydrotesting/commissioning
Year 2002-2005
Client:
AGIP Gas B.V.
Location:
LIBYA
Description:
EPCI of gathering pipelines from West C subsea facilities to Sabratha central platform and export trunklines to shore
Gas export, 36, km 107
Condensate export, 10, km 107
Gathering and service pipelines, 4/8/12/22, tot. km 74
w.d. from 141 to 193 m
Scope of Work:
Feed endorsement, detailed design, procurement, fabrication, installation, testing and commissioning testing
Year 1979-1981
Year 1992-1994
Client:
TMPC
Location:
ITALY – Sicily Channel
Description:
Crossing of the Straits of Sicily from Cape Bon (Tunisia) to Mazara del Vallo (Sicily) with 3 pipelines, diameter 20", km 466 total length, w.d.. 608 m
4th and 5th pipelines 20”/26" km 310
Messina Straits Crossing: N. 3 pipelines 20”, km 43 total length. w.d. 360 m
4th and 5th pipelines, 20”26” km 60 total length
Scope of Work:
Installation engineering, project management, shore approaches, pipelaying, post trenching, hydrotesting/commissioning
Year 1993-1994
Year 1999
Client:
Statoil
Location:
NORWAY
Description:
EUROPIPE I
gas trunkline from Draupner E riser platform in the Norwegian North Sea to a receiving station at Dornum on the German coast, 40”,
km 600
EUROPIPE II
installation and trenching of 1 sealine, 42", km 310 in 80 m w.d.
Scope of Work:
Pipelaying, tee installation, spoolpiece, tie-ins, trenching and crossing construction
Year 1999-2003
Client:
Blue Stream (BSPC - Gazprom - Snam J.V.)
Location:
RUSSIA
Description:
Gas transmission system for delivery of gas from Southern Russia to Ankara, Turkey, across the Black Sea
2 offshore pipelines, 24", km 380 approx. each line crossing the Black Sea from Djubga in Russia to Samsun in Turkey
Max. w.d. 2,150 m
Scope of Work:
Design, detailed engineering, management, procurement, construction, installation, testing and drying of pipelines
Year 2007-2008
Client:
BG Tunisia
Location:
Tunisia
Description:
CRA/carbon steel pipeline from the Hasdrubal platform to the shore at terminal location, 18”, km 106 total length
w.d. 62 m
Scope of Work:
Project management, installation engineering, procurement (bare pipes and bends free issued by Company), construction (pipes coating), installation and pre-commissioning
Year 2004-2006
Client:
Dolphin Energy
Location:
QATAR U.A.E.
Description:
Upstream pipelines from Ras Laffan (Qatar) to the offshore complexes, 36", km 82.7, 36", km 66.9 + 3 km each as onshore sections
Midstream export pipeline from Ras Laffan (Qatar) to the receiving facilities at Taweelah - U.A.E
1 pipeline, 48", km 361. Two onshore pipelines, 48, km 3.5 total as a shore approach section
w.d. 55 m
Scope of Work:
Engineering, procurement and supply, transportation, construction, installation and testing/pre-commissioning
Year 2006-2008
Client:
TTM Ltd. / PTT
Location:
THAILAND & JDA MALAYSIA
Description:
Arthit PLEM to JDA B-17 pipeline, 42, km 87 total length
From A-18 to JDA B-17 pipeline, 42, km 49.5 total length
w.d. 60 m
Scope of Work:
Project management, engineering, transportation, installation, precommissioning, commissioning, starting operation and personnel training
Year 2004-2006
Client:
BBL Company
Location:
THE NETHERLANDS
Description:
Installation of gasline from Balgzand to Bacton (Shell terminal), 36, km 230
w.d. 50 m
Scope of Work:
Pipelaying of the gasline comprehensive of the shore approaches both on UK and Holland coasts
Year 1994-1995
Client:
E.M.P.L.
Location:
MOROCCO - SPAIN
Description:
Gibraltar Straits crossing with 2 pipelines, 22, km 45 each, in max. w.d. 396 m
Scope of Work:
Project management, detailed engineering, shore approaches, preparation survey, pipelaying, hydrotesting
Year 2002-2006
Client:
ENI Gas Bv Libyan Branch
Location:
LIBYA
Description:
Sabratha platform, w.d. 190 m, jacket 23,000 t, piles 9,000 t, integrated deck 12,500 t, living quarters 1,500 t, flare boom 700 t, workover rig 700 t
Scope of Work:
Engineering, procurement, fabrication (jkt-piles), transportation and installation
Year 1998
Year 2004
Client:
Mobil Oil Canada ExxonMobil Oil Canada
Location:
CANADA
Description:
Thebaud, Venture, North Triumph platforms total weight 24,000 t in 3 phases, w.d. 29 m
New compression platform (2004)
Integrated deck 6,801 t, jacket 2,780 t, piles 3,100 t, bridges and piperacks 600 t
Scope of Work:
Engineering, procurement, fabrication, transportation and installation
Year 2003-2007
Client:
Sakhalin Energy Investment Company / Samsung HI
Location:
RUSSIA
Description:
Lunskoye (LUN-A) and Piltun-Astokhskoye (PA-B) platforms, Sakhalin island. Topsides installation by float-over method, w.d. 48 m
** Guinness world record as the biggest topside ever installed by float-over method (PA-B 28,300 t)
Scope of Work:
Towing, float-over, mating of the 2 topsides
Year 2003-2006
Client:
Encana UK Ltd.
Location:
UK
Description:
3 platforms (wellhead, process and utilities/quarters) in the Buzzard field, approx. 60 miles North East of Aberdeen in w.d. 96.5 m
Total weight 49,000 t
Scope of Work:
Transportation and installation
Year 1990-1992
Client:
Agip UK
Location:
UK North Sea, block 16/17 (UK Sector)
Description:
Tiffany platform, w.d. 126 m
Jacket 16,500 t
Various modules installed with M1 weight 8,138 t and M2 weight 6,072 t
16 skirt piles, 8 conductors, 12 caissons
Scope of Work:
Transportation and installation
Year 1993-1996
Client:
BP
Location:
UK
Description:
Wellhead platform in w.d. 115 m, comprising jacket 6,840 t, int. deck 10,400 t, flare tower 150 t
Pre-drilling template 155 t
**World record for lifting (dynamic position), 10,400 t
Scope of Work:
Engineering, procurement, transportation and installation
Year 2005-2007
Client:
Esso ExplorationAngola (Block 15) Ltd.
Location:
ANGOLABlock 15
Description:
EPCI of subsea water injection, gas injection and production flowlines, pipelines, manifolds, umbilical and risers, tied-back to Kizomba A
Production flowline P-i-P, 10/16, km 10; water injection, 10, km 6; gas injection, 10, km 3.5; umbilicals, km 9.7
w.d. 1,400 m
Scope of Work:
Engineering, procurement, construction, transportation and installation
Year 2002-2005
Client:
Esso Exploration Angola (Block 15) Ltd
Location:
ANGOLA Block 15
Description:
EPCI of subsea water injection, production and test service flowlines, pipelines, manifolds, umbilicals, CALM buoy and offloading lines
8 production, water injection and service flowlines 8/10/12, tot. km 60; 5 SHR risers; 5 manifolds; umbilicals; 8 fluid transfer lines; oil offloading system and FPSO mooring system
w.d. 1,100 m
Scope of Work:
Engineering, procurement, construction, transportation and installation
Year 2001-2004
Client:
Esso Exploration Angola (Block 15) Ltd.
Location:
ANGOLA Block 15
Description:
EPCI of subsea water injection and gas injection flowlines, pipelines, umbilicals, CALM buoy and offloading lines
6 water injection and gas injection flowlines, 4/12, tot. km 17; 6 SHR risers; 5 manifolds; 5 umbilicals; 25 flying leads; 8 fluid transfer lines; oil offloading system and FPSO mooring system
w.d. 1,200 m
Scope of Work:
Engineering, procurement, construction, transportation and installation
Year 2005-2009
Client:
TOTAL Upstream Nigeria Ltd.
Location:
NIGERIA OML 130
Description:
EPCI of subsea flowlines and riser system, umbilical system, gas export system, oil offloading and FPSO moorings
Gas export, 16”, km 150; flowlines, 8”/10”, km 70; SCR, km 26; 10 manifolds; 9 umbilicals; oil offloading system and FPSO mooring system
w.d. 1,350 m
Scope of Work:
Engineering, procurement, construction, transportation and installation
Year 2006-2008
Client:
Burullus Gas Company
Location:
EGYPT West Delta Deep Marine Conc.
Description:
EPCI of offshore subsea facilities and control system, subsea flowlines, PLETs, umbilical system, manifolds
7 coated flowlines with PLET, 10.75, km 61 total length; 8 umbilicals, km 68; 25 jumpers; 2 manifolds; 1 SDA
w.d. 1,000 m
Scope of Work:
Engineering, procurement, construction, transportation and installation
Year 2003-2007
Client:
Total E&P Angola
Location:
ANGOLA
Description:
EPCI of subsea water injection, production and test service flowlines, pipelines, manifolds, umbilical system, risers
Production flowline P-i-P, 8/12, km 55; water injection, 10, km 40; 18 spools and 4 manifolds; 1 BHOR; 8 production and WI umbilicals, km 80
w.d. 1,400 m
Scope of Work:
Engineering, procurement, construction, transportation and installation